⛳ THE THREE GOLF INFRASTRUCTURE ASSETS (EasyGrass™ OS)

BENEATH THE GREEN (Underground Capsule)

FIG 1.1 — SYSTEM DEPLOYMENT MATRIX (SUB-SURFACE PERIMETER)


3D EXPLODED BLUEPRINT (Technical Drawing)

FIG 1.2 — ENGINEERING SPECIFICATION // 3D EXPLODED CAD BLUEPRINT


GREENKEEPER COMMAND HUB (Control Room)

FIG 1.3 — MAINTENANCE HUB CONTROL // REAL-TIME TURF COCKPIT OVERLAY


⚽ THE THREE FOOTBALL ARENA INFRASTRUCTURE ASSETS (EasyGreen™ Calcio)

STADIUM HERO LAUNCH POSTER

FIG 2.1 — MARKETING COMPLIANCE // ELITE PITCH ENFORCEMENT POSTER


CALCIO EDITION CAD EXPLODED BLUEPRINT

Exploded 3D view of the EasyGreen Calcio sensor node with labelled hardware layers

FIG 2.2 — ARENA HARDWARE SPECIFICATION // 3D EXPLODED SCHEMATIC


TURF COCKPIT (Elite Football Control Room)

Two staff members at an EasyGreen Calcio dashboard with a stadium view and green-lit handheld terminals

FIG 2.3 — ARENA OPERATIONS // PADDOCK TURF COMMAND CENTER INTERACTION

🔬 EasyGreen™ & EasyGrass™ Combo Configurator

⚠️ STRATEGIC NOTE: SELECT MULTIPLE SECTORS FOR A COMBO DISCOUNT (-15%)

One-Off Upfront Setup & Calibration Costs (Setup Fee): € 15.000,00
Gross Monthly Hire Purchase / Lease (€150/unit baseline): € 15.000,00
Applied Settebello Combo Discount (15% Multi-Sector): € 0,00
Secure Private Network Costs & Sub-GHz Telemetry (€10 per set): − € 1.000,00
Calculated Monthly Net MRR Surplus (OPEX Lease): € 14.000,00
INITIALISE AND LOCK COMBO FLEET VOLUME ➔

🔒 SECURE PORTAL // HOLDING COMMAND CENTRE EXECUTIVE DIRECT LINE

INITIATE AUTOMATED AUDIT REQUEST ➔